Refit GRE-33

17 february, 2019: The refit of the fishing vessel GRE-33 Vertrouwen has been successfully completed in the port of Urk. Piet Brouwer Electrotechnology installed a new main switch panel in the engine room with engine starters for the hydraulic pumps.

The bow was completely emptied and provided with new control panels, and Piet Brouwer renovated the control panels in the wheelhouse. The existing fire alarm system was also replaced and expanded, and the necessary indoor and outdoor lighting replaced by LED fittings.